Renewable Energy Projects
Renewable Energy Projects
Photovoltaic Parks: Projects & Business Development
10 hectares
Yield: 1.950 kwh/m2/year
Interconnection Distance: 3.200 m.
Voltage connection: 15 kV
ICC Value: USD 154.365
Node Price Reference: Charrúa
Altitude: 160 m.
Minning Rights: In Process
Environmental Status: Ok
IFC Status: Approved
Development and finish construction: 1 year
Construction time: 6 months.
Operation time: 25 years.
Limited supply of PMGD projects that can benefit from a stabilized price
Irradiation lower than projects located in RM, VI, VII region.
Long interconnection for installed power.
Project received at a stabilized price.
Use of land suitable for the type of project.
Cheap interconnection of a few meters of line and short easements.
Development cost included.
Location close to major cities, reduces cost of transport of material, workers, no need for mancamp, etc.
Reduced deadlines to start receiving income, less than a year.
Enviromental base line (human studies, Flora and fauna, archeologyst, landscape, river channels, etc.
Studies and analysisfor sectorial permits.
Minning Cadastre.
Basic Engineering of interconnection and comunicationsfor 3 MW Project.
Topography studies.
Hidrology studies.
Preliminary Soil test.
Irradiation studies.
Real estate titles studies.