Renewable Energy Projects
Renewable Energy Projects
Photovoltaic Parks: Projects & Business Development
12 hectares
Yield: 1966 kwh/m2/year.
Interconnection Distance: 1.800 m.
Voltage connection: 13,2 kV.
ICC Value: TBD.
Node Price Reference: Charrua
Altitude: 160 m.
Minning Rights: In Process
Environmental Status: In Process
IFC Status: In Process
Development and finish construction: 1 year.
Construction time: 6 months.
Operation time: 25 years.
Payments:
Project sale Price:
Limited supply of PMGD projects that can benefit from a stabilized price
Project in central zone, with good radiation.
Project received at a stabilized price.
Use of land suitable for the type of project.
Cheap interconnection of a few meters of line and short easements.
Development cost included.
Location close to major cities, reduces cost of transport of material, workers, no need for mancamp, etc.
Reduced deadlines to start receiving income, less than a year
Enviromental base line (human studies, Flora and fauna, archeologyst, landscape, river channels, etc.
Studies and analysisfor sectorial permits.
Minning Cadastre.
Basic Engineering of interconnection and comunicationsfor 3 MW Project.
Topography studies.
Hidrology studies.
Preliminary Soil test.
Irradiation studies.
Real estate titles studies.